العربية
phoenix building approvalsphoenix building approvals aa chambernfpa member
afasafas
rotate ipad Rotate yout tablet for better experience
rotate phone Rotate yout smartphone for better experience

Building Permits

WORKING WITH THE MUNICIPALITIES THROUGHOUT THE MIDDLE EAST

Phoenix Middle East Safety and Fire Engineering Consultancy LLC enjoys an excellent working relationship throughout the Middle East with the relevant Municipalities in each country. Having worked closely with the Municipalities over a number of years, we have developed expertise in the area of building regulations and procedures for building permits, allowing us to efficiently expedite the process and obtain building permits without undue delay.

As a consequence of the constantly changing and evolving Building and Planning regulations required to keep pace with the rapid rise of projects in the Middle East, there is always the risk that a wrong design decision could be made at various stages of a project. Our team of experts mitigate such risks by addressing ambiguities within the regulations, and work in parallel with the Municipalities to ensure a smooth approvals path.

Our experience and ability to work with mutual respect with the local Authorities, coupled with our intimate knowledge of regulations and procedures is fundamental to our success in achieving the required outcomes.

SERVICES

With our thorough knowledge and long experience of the Relevant Municipalities Building Regulations and Building Permit Procedures, Phoenix Middle East Safety and Fire Engineering Consultancy LLC highly skilled team offers a smooth and efficient service at all stages of the application procedures, including:

  • Local Building Regulations advice and guidelines
  • Building Permit Procedures assistance
  • Production and Submission of Documentation and Drawings following Municipality Standards required to obtain Building Permits

Phoenix Middle East Safety and Fire Engineering Consultancy LLC provides expert formal registration of the project (pre-qualification) and the submission of documentation for planning and concept approval, through to the final submission.

Phoenix Middle East Safety and Fire Engineering Consultancy LLC is highly skilled in the preparation of documentation for submission to the relevant Municipality for the requisite permits and plan approvals, namely:

  • Temporary Fence, Site Preparation and Mobilisation Permit Excavation Permit
  • Building Permit –
  • Architectural Approval
  • Structural Approval
  • Foundation and Sub-Structure Permit
  • Building Completion Certificate

In addition to offering speed and efficiency in obtaining permits, Phoenix Middle East Safety and Fire Engineering Consultancy LLC is committed to sharing its knowledge and fully explains all steps taken during the process, and each of the possible options available, prior to the lodgement of any submission.

PROCESS

Building permit application procedures are relatively complex and comprehensive. Phoenix Middle East Safety and Fire Engineering Consultancy LLC provides expert assistance throughout the entire process including the three main stages as outlined below.

Stage 1 - Project Pre-Qualification

The co ordination and provision of the following documents such that formal registration and a project number may be obtained:

  • Coloured Site layout Plans and Artist's Impressions of Project
  • A copy of the Approved Affection Plan
  • A copy of Official Trade License
  • A copy of Appointment Letter
  • Following registration, meetings with the Municipality may be organised in order to determine design compliance as relates to the relevant regulations, codes and submission standards.

Stage 2 - Preliminary Planning & Concept Approval

This stage provides the opportunity to apply for the requisite building permits, which ordinarily involve a complete schematic design documentation submission including

  • Request for Architectural Approval
  • Declaration & Calculation Forms
  • Car Park Calculation Tables
  • Sanitary Facilities/Fitting Calculation Tables
  • Gross Floor Area Calculation Tables
  • Architectural drawings following the required Code Standards.

Stage 3 - Design Review

Final submission of Architectural and Structural Drawings are submitted and modified accordingly based on the in principle agreements reached during each of the meetings and negotiations undertaken with the Municipality.

  • Final submission of Architectural and Structural Drawings are submitted and modified accordingly based on the in principle Residential
  • Commercial
  • Miscellaneous